Service alerts
Construction, utility, service, and other facility-related alerts featured on this page are also emailed to all relevant faculty and staff listservs. Manage your building notice subscription(s) on our building notifications page.
Please note that Facilities Services has regularly scheduled power disruptions that are not listed on this page.
The following facilities have active service alerts:
-
Anderson Health Science (AHS)
Construction notice
Affected dates
Monday, March 20 through Friday, April 28
Description of work
- Contractors will upgrade the fire alarm systems.
Impact for Occupants:
- There will be intermittent noise, dust, vibrations, and non-toxic odors associated with this project.
- There will be intermittent detours within the building
- Additional notices will sent when the fire alarm is tested.
Action(s) Required:
- Please use caution near construction equipment and crews.
- Please do not enter sealed-off construction areas.
Questions or concerns regarding this work:
- Contact Chad Strawn about project #: 20RPR01754
-
Sarah H. Fleischmann Building
Construction notice
Affected dates
Friday, March 24 - Friday, April 28
Description of work
Contractors will repair the Silver 2 Parking lot located between Sarah H. Fleischmann Building and Fleischmann Agriculture Building.
Impact for Occupants
- The southern portion of the parking lot will be closed.
- There will be intermittent noise, vibrations and non-toxic odors associated with this project.
Actions(s) Required
- Please follow detour signage and do not enter sealed-off construction areas.
- Please use caution near construction equipment and crews.
-
Howard Medical Sciences (HMS)
Construction notice
Affected dates
Monday, March 20 through Friday, April 28
Description of work
- Contractors will upgrade the fire alarm systems.
Impact for Occupants:
- There will be intermittent noise, dust, vibrations, and non-toxic odors associated with this project.
- There will be intermittent detours within the building.
- Additional notices will sent when the fire alarm is tested.
Action(s) Required:
- Please use caution near construction equipment and crews.
- Please do not enter sealed-off construction areas.
Questions or concerns regarding this work:
- Contact Chad Strawn about project #20RPR01754
-
Knudtsen Resource Center
Painting notice
Affected dates
Friday, March 10 through Friday, March 31 6:00 a.m.-4:30 p.m.
Description of work
Facilities Maintenance Services technicians will paint the public areas in the building, including the corridor ceilings, corridor walls, and metal doors.
Impact for occupants
- Painting preparation for the ceilings will occur on Friday, March 10, 17, and 24, with limited impact on pedestrian traffic.
- Painting of the ceilings will occur on Saturday, March 11, 18, and 25, with some limited access to the building during these dates.
- The walls in the public corridors will be painted Monday through Thursday.
- Signage indicating wet paint will be posted in painting areas.
- There will be limited intermittent noise, nontoxic paint odors, and dust associated with this work.
Action(s) required
- Please use caution near painting equipment and crews.
- Please follow posted signage and do not enter coned-off painting areas.
-
Mathewson-IGT Knowledge Center
Construction Notice
Affected dates
Monday, February 6 through Friday, April 21, 2023
Description of work
- Contractors will renovate the existing conference room 412 into six new individual office spaces.
Impact for occupants
- There will be intermittent detours adjacent to the project location.
- There will be intermittent noise, dust, vibrations and non-toxic odors associated with this project.
Action(s) required
- Please use caution near construction crews, equipment and activity.
- Please follow posted signage and do not enter barricaded areas.
Questions or concerns regarding this work
- Contact Rodrigo Ferreira about Project #: 22RNV02148
-
Manville Health Science (MHS)
Construction notice
Affected dates
Monday, March 20 through Friday, April 28
Description of work
- Contractors will upgrade the fire alarm systems.
Impact for Occupants:
- There will be intermittent noise, dust, vibrations, and non-toxic odors associated with this project.
- There will be intermittent detours within the building.
- Additional notices will sent when the fire alarm is tested.
Action(s) Required:
- Please use caution near construction equipment and crews.
- Please do not enter sealed-off construction areas.
Questions or concerns regarding this work:
- Contact Chad Strawn about project #20RPR01754
-
Nellor Biomedical Sciences (NBS)
Construction notice
Affected dates
Monday, March 20 through Friday, April 28
Description of work
- Contractors will upgrade the fire alarm systems.
Impact for Occupants:
- There will be intermittent noise, dust, vibrations, and non-toxic odors associated with this project.
- There will be intermittent detours within the building.
- Additional notices will sent when the fire alarm is tested.
Action(s) Required:
- Please use caution near construction equipment and crews.
- Please do not enter sealed-off construction areas.
Questions or concerns regarding this work:
- Contact Chad Strawn about project #20RPR01754
-
Orvis Building
Construction notice
Affected dates
Friday, March 24 - Friday, April 28
Description of work
Contractors will repair the Silver 2 Parking lot located between Sarah H. Fleischmann Building and Fleischmann Agriculture Building.
Impact for Occupants
- The southern portion of the parking lot will be closed.
- There will be intermittent noise, vibrations and non-toxic odors associated with this project.
Actions(s) Required
- Please follow detour signage and do not enter sealed-off construction areas.
- Please use caution near construction equipment and crews.
-
Savitt Medical Science (SMS)
Construction notice
Affected dates
Monday, March 20 through Friday, April 28
Description of work
- Contractors will upgrade the fire alarm systems.
Impact for Occupants:
- There will be intermittent noise, dust, vibrations, and non-toxic odors associated with this project.
- There will be intermittent detours within the building.
- Additional notices will sent when the fire alarm is tested.
Action(s) Required:
- Please use caution near construction equipment and crews.
- Please do not enter sealed-off construction areas.
Questions or concerns regarding this work:
- Contact Chad Strawn about project #20RPR01754