OPEN PIT DESIGN
BOTTOM OF THE PIT = 5,210ft ELEVATION
HIGHEST POINT = 6,170ft ELEVATION
WALL SLOPE = 50°
RAMP = 80ft WIDE WITH 10% GRADE
MINING BENCHES 20ft HIGH
3,500ft LONG AND 2,500ft WIDE
DILUTION = 10%
CUT OFF 0.03oz/t
MINABLE RESERVE = 42.6 MILLION TONS
STRIPPING RATIO = 2.5:1
Previous slide
Next slide
Back to first slide
View graphic version