Underground Ore Conveyance
3 Primary Conveyance Systems
Mainline System
( peak load of 1,178 tons/hr)
Sub-main System from Panel Development
(peak load of 226 tons/hr)
Sub-main System from Longwall Operation
(peak load of 942 tons/hr)
Production Hoist
1168 tons/hr