Recommendations
Further Investigation of Mitigating Factors
Whittle Optimization of Open-Pit Design
Investigate Smaller Bench Size
Further Geologic Research
In-Depth Look at Mill Capital Costs
Final Location for Molybdenum Shipment
Further Reclamation Planning
Precise Water Table Location
Further Drilling Around Outside of Deposit
Further Drilling Within Deposit Boundaries