Mining: Tailings Dam
Walls designed on three sides
30-foot flat bench on top of dam
Design Slope: 2.5 to 1
Maximum Height: 200 feet
Dam Construction: Contracted at $1.80 per cubic yard of dam material
Total Dam Construction Cost: $36.6 million