1999 Grand Target Mine Feasibility Study
Project Overview
LOCATION
Environmental Concerns
Reserve Estimation
PPT Slide
Total Mineable Reserves
Mining
Main Decline: Plan View
Main Decline: Long Section View
Main Decline: Section View
Underground Development
Primary Development to Ventilation Raises
Typical Level
Stoping
Step 1: Drive top and bottom sill drifts
Step 2: Drill 36 - 6.5 inch diameter blast holes
Step 3: Blast and muck the 1st 14-ft slab of ore
Step 4: Blast and muck the 2nd 14-ft round
Step 4: Blast and muck the 3rd 14-ft round
Backfill
Ventilation
Auxiliary Ventilation on Working Levels
Major Equipment
Auxiliary Equipment
Production
Processing
Infrastructure
Employment
Financial Analysis
Costs
Cost Summary
Refining
Loan
Economic Analysis
Recommendations
Download presentation source