1999 Grand Target Mine Feasibility Study

Project Overview

LOCATION

Environmental Concerns

Environmental Concerns

Reserve Estimation

Reserve Estimation

PPT Slide

Total Mineable Reserves

Mining

Main Decline: Plan View

Main Decline: Long Section View

Main Decline: Section View

Underground Development

Primary Development to Ventilation Raises

Typical Level

Stoping

Step 1: Drive top and bottom sill drifts

Step 2: Drill 36 - 6.5 inch diameter blast holes

Step 3: Blast and muck the 1st 14-ft slab of ore

Step 4: Blast and muck the 2nd 14-ft round

Step 4: Blast and muck the 3rd 14-ft round

PPT Slide

Backfill

Ventilation

Auxiliary Ventilation on Working Levels

Major Equipment

Auxiliary Equipment

Production

Processing

Infrastructure

Employment

Financial Analysis

Costs

PPT Slide

Cost Summary

Refining

Loan

PPT Slide

Economic Analysis

Recommendations