University of Nevada, Reno: Comprehensive Master Plan Web Site. Click to navigate to the home page.
Work Session #4A - Supplemental - 24 May 04


Purpose
This supplemental meeting to work session #4 focused on the preferred alternative presented in work session #4. The meeting was held to include members of the President's Council not able to attend Work Session #4. These members included the President and Athletics' Director.

Document icon. Check for downloadable documents in this section. Download & Print

Conference Report
WS#4A

PDF: 4.7 MB


List of Exhibits

Exhibits from Work Session #4

  Projected Program Chart

•  Draft Illustrative Master Plan

•  Draft Land Use Master Plan

•  Draft Phasing Plan

•  Draft Transportation Master Plan

•  Evans Avenue Sections

•  Access to Campus from 1-80 Wells Street Exit

•  Campus Entry Sequence Study A

•  Campus Entry Sequence Study B

•  Campus Entry Sequence Study C

•  Mixed Use District Diagram

Exhibits New to this Work Session

•  Siting Studies for the Nevada Cancer Institute

•  Child and Family Research Center Potential Locations

•  Siting Studies for the Fine Arts Center

•  3-D Model of Massing for the Fine Arts Center

•  Student Union - Optional 3-D Massing Studies

•  Mid-Campus Quad Landscape

•  Mid-Campus Grading ([prepared after the meeting)

Previously Shown Maps Used for Reference
Not included in this conference report

 Project Schedule

• Existing Campus Key Map

• Aerial Photograph




Landscape concept for Mid-Campus Quad

Landscape concept for Mid-Campus Quad


.



Home > Work-to-date > 4 February 2003 Conference Report